Lake Lanier Real Estate Today! A Look At Pathways And Steps On The Government Shoreline Of The Lake!

In Lake Lanier real estate today, I thought that it might be wise to examine one of the most common questions that I am asked as a real estate agent when I am showing properties on Lake Lanier.  Whether it be land, lots or homes, most Lake Lanier real estate backs up to property owned by our federal government and managed by the U.S. Army Corps of Engineers.  It is typical to walk to the back of a given private property and notice boundary markers and survey pins which designate the separation points of privately owned property and government land which is between the private land and the waters of Lake Lanier.  We often casually refer to this government land as "Corps Property", "Corps Of Engineers Land" or "Guvmunt Land"! (-:

Most potential real estate buyers on Lake Lanier will eventually ask what their personal rights are in regard to this property that separates the private land from the water.  Normally, my immediate response to this is NONE!  Well, it's not your land!  But if you have a dock permit that is granted with the property or home that you purchase on Lake Lanier, you will have some ability to access this government land by creating and/or maintaining a foot path from your private property (Lake Home) through the Corps' Property and down to your dock on Lake Lanier.  So, the questions regarding the government land often range in topics from "Can I cut trees?", "Can I clear and undercut?", "Can I mow?", Can I pave a sidewalk?", "Can I clear a path for my car to get to my dock?", "What can I do on their land?", "Do I maintain it?"  The best answer to these and many more questions on this topic can be found in the 2004 Final Lake Lanier Shoreline Mangement Plan.  You'll find so much information and guidance in this plan, that you'll soon learn that you and your neighbors might not be following appropriate guidelines.  For this reason and more, you should read the Plan.  So, our exercise for today is to read this excerp regarding proper guidelines for pathways and steps along Lake Lanier's shoreline, courtesy of the U.S. Army Corps Of Engineers Mobile District.  Please enjoy!


15.3.11 Pathways and Steps

Meandering pedestrian pathways may be created for access to the permitted facilities at no
fee. Pathways will follow a meandering route that conforms to the topography as much as
possible to help prevent erosion, avoid the need for removal of vegetation, and prevent the
construction of bridges or steps. All work will be completed with hand tools only unless
otherwise authorized in writing by the Operations Manager. If surface treatment is required
to prevent erosion or fill depressions, wood chips or on-site forest litter are recommended. If
erosion is evident due to continued foot traffic and water run off, intermittent water breaks
may be necessary.
If slopes prohibit safe access by means of a natural path then steps or a bridge creating the
least environmental impacts may be authorized under permit with a fee. Materials used to
create these structures must be properly treated and environmentally friendly, no wood
treated with arsenic will be authorized. All steps must be constructed of at least eight (8)
inches wide by six (6) inches high material without borders. Every effort should be made to
prevent continuous running steps. Steps may not be elevated nor create a boardwalk. Steps
or landings may not be erected in a manner to create patios. Unless the steepness of the slope
dictates it or handicap needs demand it, steps should be constructed without handrails. All
steps must be constructed at contour or ground level. If backfilling is required, the surface
treatment must be wood chips or similar mulch. Landscape timbers are not authorized for
step construction due to safety considerations.
Footbridges may only be authorized if there are no other alternatives to provide safe access.
Footbridges may not exceed four (4) feet in width. All foot bridges more than four (4) feet
above the surface of the ground must have a handrail. The rails shall be 36-48 inches high
with an intermediate guardrail approximately one-half the distance below the top rail. The
pathway permit does not convey the right to use equipment or construct any other structure
unless specifically authorized.
Pedestrian access lighting may be installed underground following the meandering footpath.
Permit holders are required to use mushroom style lighting, not to exceed a height of two (2)
feet. See Exhibit 3, " Requirements for Installation and Use of Electric Service on
Government Property at Lake Lanier". Existing pathway lighting not meeting this standard
will require replacement upon repair.
Natural pathways are considered unsafe when the terrain is too steep to safely access the
shoreline, thus requiring improved steps. Pathways must remain free of stumps, snags and
other tripping hazards. Steps are considered unsafe and unauthorized when poorly placed or
constructed so that the step is loose; or when materials are defective damaged, or decaying.
















Thursday, May 03, 2007

USACE Announces A Moratorium On New Dock Permits At Lake Lanier

The following letter was issued by the U.S. Army Corps Of Engineers recently, in regard to the status of dock permits on Lake Lanier:

CORPS ANNOUNCES MORATORIUM ON NEW DOCK PERMIT APPLICATIONS AT LAKE LANIER

Lake Sidney Lanier, GA – The U.S. Army Corps of Engineers at Lake Sidney Lanier will begin implementation of a moratorium on accepting new appointments/applications for private boat dock permits on Friday, April 27, 2007. “This moratorium is necessary to allow project personnel to address the numerous existing applications and appointments to determine where the project stands in relation to the maximum carrying capacity identified in the 2004 Shoreline Management Plan,” said Jonathan Davis, Operations Project Manager, Lake Sidney Lanier. In December 2004, following two years of study and public involvement, the Corps completed an update of the Lake Lanier Shoreline Management Plan and an Environmental Impact Statement (EIS). The Lake Lanier Shoreline Management Plan addresses several lake management objectives, one of particular interest is the total carrying capacity, or density, for private boat docks on the shoreline. The Plan and the EIS established a maximum carrying capacity of 10,615 boat docks. In order to comply with the EIS and Shoreline Management Plan, once the 10,615 number is reached no new dock permits can be issued. “The moratorium is necessary for us to complete the evaluation and processing of pending dock permit applications and appointments which have been received to date,” said Davis. “The moratorium will be in place for 120 days to allow us to do this.” The moratorium does not affect the normal processing for existing dock permits (i.e. reissue upon expiration or transfer of ownership). -more-

CORPS MORITORIUM ON DOCK PERMITS LAKE LANIER 2-2-2 Following the moratorium the Corps will then have an exact number of remaining dock permits that could be issued if the current number does not exceed the 10,615. There are approximately 500 available permits remaining. The moratorium will give project personnel the necessary time to process what is currently on hand to determine how many of those qualify for a dock permit and then determine how many, if any, remain. `

For additional information or questions contact the Corps at 770-945-9531. For daily lake level information call 770-945-1467. Thirty-day lake level forecasts and historical lake level information can be viewed on the Corps water management website (http://water.sam.usace.army.mil) -30-